Vrooman Road Bridge Replacement

Home    Project Purpose     Planning / Impacts    Project Stakeholders    Contacts

Project Purpose

 

The purpose of this project is to replace the existing, structurally-deficient and functionally-obsolete

Vrooman Road Bridge (SFN 4337107) over the Grand River, that regularly closes during flood events

with a bridge and roadway facility that meets current design standards and improves existing geometrics

correcting existing roadway geometric deficiencies, while providing a safe, efficient route.

 

The existing Vrooman Road Bridge (SFN 4337107) is a structurally-deficient and functionally-obsolete

bridge that regularly closes during flood events. The existing roadway approaches to the bridge are

characterized by numerous geometric deficiencies, which can be directly linked to high accident rates at

various points along the roadway. The existing Vrooman Road and SR-84 intersection is characterized by

numerous geometric deficiencies, which can be directly linked to high accident rates at the intersection.

 

Approved Purpose and Need Statement 9-9-09

 

Proposed Improvements:

  • Project would replace existing low-level river crossing with a high level crossing on one of two proposed alignments.

  • Improved horizontal and vertical alignments.

  • Improved intersection geometry at project termini.

Existing Conditions:

Existing Bridge

Functional Classification

  • Urban Arterial/Collector (NOACA/ODOT).

  • Current (2008) ADT approximately 5,200 Vehicles per Day (VPD).

  • Opening Year (2012) ADT approximately 5,200 VPD.

  • Design Year (2032) ADT approximately 5,900 VPD.

 

Flooding

  • Road and bridge close due to flooding on average 2-3 times annually in spring and/or fall.

  • Closed 6 months in 2006.

  • Typical closure lasts 1-2 days.

 

 

2005 Flood

Structure Condition

  • Superstructure constructed on original substructure in1952.

  • Substructure dates to 1879.

  • Current General Appraisal and Operational Status 3P.

  • Rated on a 0-9 scale, 0 being worst, 9 being best.

  • 3 rating considered “Serious Condition”.

  • “P” indicates posted for load restriction.

  • Bridge Sufficiency Rating 2.0

  • Abutments suffering from scour damage.

Roadway Geometrics

  • Steep approach grades.

  • 12% +/- grade on south approach.

  • 15% +/- grade on north approach.

  • Approach horizontal curves exceed minimum acceptable radius for design speed and functional

  • classification.

  • Inadequate sight distance at signalized Vrooman Road / SR-84 intersection.

 

Text Box: Maintenance

  •         Approximately $70,000 annual additional maintenance costs related to snow and ice removal; flood monitoring; flood debris removal; and emergency repairs.

Documented Accident History, Three Year Period 2000 to 2002

  •             8 accidents at Vrooman Road Bridge.

  •             8 accidents at Vrooman Road / Seeley Road Intersection.

  •             12 accidents at signalized Vrooman Road / SR-84 Intersection.